St. Mary Our Lady of Peace Bid Documents
Final Construction Drawings OLOP
A0 A4.4 A6.6 AC1.0 S1.0 M1-0 E10-site 6-23-11
A1.0 A4.5 A7.0 AC2.0 S2.0 M1-1 E20-ltg 6-23-11
A1.1 A5.0 A7.1 AC2.1 S2.1 M3-0 E21-pwr 6-23-11
A1.2 A5.1 A8.0 AC2.2 S3.0 M4-0 E22-roof 6-23-11
A2.0 A5.2 A-TS C-1 S3.1 M4-1 E30-kitchen 6-23-11
A2.1 A6.0 C-2 S4.0 P1-0 E40--scheds-diags 6-23-11
A3.0 A6.1 C-3 S4.1 P2-0 E41-scheds-diags 6-23-11
Final Construction Drawings RECTORY
A1.0 S1.0 RECTORY M1-0R E10-rect 6-23-11
Final Construction Drawings St. Mary's
A00 S2.0 ST MARYS M1-0 E10-main 6-23-11
A1.0 S2.1 ST MARYS M1-1 E11-main-FA 6-23-11
A1.1 S3.0 ST MARYS M3-0 E20-scheds 6-23-11
Addenda 7 issued 6.9.11
Addenda 6 issued June 1, 2011
Addenda # 5 issued 5.13.11 includes the following files:
11-6005 Geotech Report - Smith ranch road only
st mary olop wood clarification Div06
Scope Matrixes attached. Please submit with your proposal.
End of
Addenda 5
Revised Civil drawings issued 3.25.11
St. Mary Plans:
A00 Code plans, site location map, notes & calculations
A1.0 Demolition plan, notes & plan details
A1.1 Floor plans, notes, room finish & door schedules, partial exterior elevations
A2.0 Enlarged floor plans, interior elevations & interior details
A3.0 Reflected ceiling plans, ceiling notes & details
A4.0 Interior details
A5.0 Door & frame types
A-TS Title sheet
E10-main 3-9-11 Main level electrical plan
E20-scheds 3-9-11 Electric schedules & 1 line diagram
M1-0 Mechanical hvac demo plan
M1-1 Mechanical hvac plans
M3-0 Mechanical hvac schedules
M4-0 Mechanical hvac details
P1-0 Plumbing demo plan
P1-1 Plumbing plan
P3-0 Plumbing schedules
S2.0 Main floor & balcony plan
S2.1 framing plan
S3.0 details
Our Lady of Peace Plans: Please reference revised civils posted above
A0.0 Code sheet
A1.0 Main level floor plan
A1.1 Door & Room finish schedules & clerestory plan
A1.2 Plan details
A2.0 Exterior elevations
A2.1 Exterior elevations
A3.0 Building sections
A4.0 Wall sections
A4.1 Wall sections
A4.2 Wall sections
A4.3 Wall sections
A4.4 Canopy section
A4.5 Wall sections
A5.0 Door & window frame type & details
A5.1 Head, jamb & sill details
A5.2 Head, jamb & sill details
A6.0 Enlarged floor plans & interior elevations
A6.1 Enlarged floor plans & interior elevations
A6.2 Enlarged floor plans & interior elevations
A6.3 Enlarged floor plans & interior elevations
A6.4 Details
A6.5 Enlarged floor plan & details
A6.6 Worship room & sanctuary interior elevation & details
A7.0 Main level reflected ceiling plan
A7.1 Ceiling details
A8.0 Roof plan & details
AC1.0 Site plan
AC2.0 Site details
AC2.1 Site details
AC2.2 Cross tower details
A-TS Title sheet
Civil drawings are revised and are listed above.
E10-site 3-9-11 Electrical site plan
E20-ltg 3-9-11 Lighting plan
E21-pwr 3-9-11 power plan
E22-roof 3-9-11 De-ice system roof plan
E30-kitchen 3-9-11 Enlarged kitchen power plan
E40-scheds-diags 3-9-11 Electrical schedules & diagrams
E41-scheds-diags 3-9-11 Panel schedules
L1 Landscape notes
L2 Landscape planting plan
L3 Landscape materials plan
L4 Landscape details
L5 Irrigation plan
L6 Irrigation details
M1-0 Mechanical hvac plan
M1-1 Mechanical hvac piping plan
M3-0 Mechanical hvac schedules
M4-0 Mechanical hvac details
M4-1 Mechanical hvac details
P1-0 Plumbing plan
P2-0 Plumbing enlarged plans
P3-0 Plumbing schedules
P4-0 Plumbing details
S1.0 Structural notes
S2.0 Foundation plan
S2.1 Roof framing plan
S3.0 Details
S3.1 Details
S4.0 Details
S4.1 Details
S4.2 Details
S4.3 Details
S5.0 Details
S5.1 Details
S5.2 Details
OLOP RECTORY Plans:
A1.0 Floor plan, Door & room Finish Schedule & Plan details
A2.0 Exterior Elevations & Details
A3.0 Wall SEctions
A4.0 Interior Elevations & details
A5.0 Door & Window frames types & details
A6.0 REflected ceiling plan
A7.0 Roof plan, door & window details
AC1.0 Overall site plan - for information only
AC1.1 Site plan
A-TS Title sheet
E10-rect3 Rect 1 REctory electrical plan
M1-0R Mechanical hvac plan
P1-0R Plumbing plan
S1.0 Structural notes & details
S2.0 Foundation plan
S2.1 Roof framing plan
S3.0 foundation details
S4.0 roof framing details
Specs:
012500-Substitution Procedures
013100-Project Management Coordination
013200-Construction Progress Documentation
017823-Operation and Maintenance Data
017839-Project Record Documents
017900-Demonstration and Training
024119 SF - SELECTIVE STRUCTURE DEMOLITION
034500 SF - ARCHITECTURAL PRECAST CONCRETE
051200-Structural Steel Framing
061753-Shop Fabricated Wood Trusses
064023-Interior Architectural Woodwork
064116 SF - PLASTIC-LAMINATE-FACED ARCHITECTURAL CABINETS
072100 SF - THERMAL INSULATION
076200-Sheet Metal Flashing and Trim
081113-Hollow Metal Doors and Frames
081433-Stile and Rail Wood Doors
083113-Access Doors and Frames
084113-Aluminum Framed Entrances and Storefronts
092216-Non-Structural Metal Framing
095113-Acoustical Panel Ceilings
096513-Resilient Base and Accessories
099120-Painting Professional Line
099600 SF - HIGH-PERFORMANCE COATINGS
101100 SF - VISUAL DISPLAY SURFACES
102113 SF - TOILET COMPARTMENTS
102800-Toilet Bath Accessories
104413-Fire Extinguisher Cabinets
113100 SF - RESIDENTIAL APPLIANCES
122113 SF - HORIZONTAL LOUVER BLINDS
123530 SF - RESIDENTIAL CASEWORK
123661 SF - SIMULATED STONE COUNTERTOPS
211313 fl - wet-pipe sprinkler systems
220513 fl - common motor requirements for plumbing equipment
220516 fl - expansion fittings and loops for plumbing piping
220517 fl - sleeves and sleeve seals for plumbing piping
220518 fl - escutcheons for plumbing piping
220523 fl - general-duty valves for plumbing piping
220529 fl - hangers and supports for plumbing piping and equ
220719 fl - plumbing piping insulation
221116 fl - domestic water piping
221119 fl - domestic water piping specialties
221316 fl - sanitary waste and vent piping
221319 fl - sanitary waste piping specialties
223300 FL - electric domestic-water heaters
223500 FL - domestic - water heat exchangers
224716 fl - pressure water coolers
230513 fl - common motor requirements for hvac equipment
230516 fl - expansion fittings and loops for hvac piping
230519 fl - meters and gages for hvac piping
230523 fl - general-duty valves for hvac piping
230529 fl - hangers and supports for hvac piping and equipme
230593 fl - testing adjusting and balancing for hvac
230716 fl - hvac equipment insulation
230719 fl - hvac piping insulation
230900 fl - instrumentation and control for hvac
230993 fl - sequence of operations for hvac controls
231123 fl - facility natural-gas piping
233300 FL - AIR DUCT ACCESSORIES
233416 fl - centrifugal hvac fans
233713 FL - DIFFUSERS REGISTERS AND GRILLES
235216 fl - condensing boilers
04431316 SF - ADHERED STONE MASONRY VENEER
10222613 SF - ACCORDION FOLDING PARTITIONS
22421313 fl - commercial water closets
22421316 fl - commercial urinals
22421613 fl - commercial lavatories
22421616 fl - commercial sinks
A201 - General Conditions of the Contract for Construction